Fire Protection Systems

Fire Protection Systems Design Review

ZFS reviews fire protection system drawings and supporting documents against the agreed project basis. Findings are recorded so the design or contractor team can address technical comments and coordinate revised information.

The applicable scope and jurisdiction are confirmed before the work starts.

Fire Protection Systems Design Review
Fire Protection Systems Design Review

Trusted by facility and project teams across the UAE

  • Serco
  • Abu Dhabi Grammar School
  • ENEC
  • Imdaad
  • Khidmah
  • Bab Al Qasr Hotel
  • Colliers

When to appoint

  • Shop drawings are ready for review
  • Authority comments need a coordinated response
  • Site changes affect previously reviewed information

What you receive

  • A comments register
  • Reviewed documents
  • Recorded outstanding items or limitations

What to send

  • Drawings and calculations
  • Approved strategy
  • Prior approvals
  • Product data
  • Authority comments and submission history

How the appointment works

We confirm the scope and information required, complete the agreed review or site work, then issue the findings and deliverables. Any further design, retesting, reinspection or submission support is identified in the appointment.

Scope

  • Defined fire protection system drawings and calculations
  • Consistency with the strategy and approved design
  • Relevant equipment information
  • Numbered review comments
  • Review of responses and revisions

Questions

Is a stamp the same as authority approval?
No. Consultant review or stamping and authority approval are distinct. The appointment explains ZFS’s role and the required next steps.
Can you resolve comments without the original drawings?
Relevant drawings and the comments are needed for a meaningful review. An initial enquiry can start before the full package is available.
Do I need drawings before I enquire?
No. Existing plans, reports or authority comments help define the scope, but you can start with a description of the project.
Can ZFS guarantee an authority approval?
No. We can review the relevant information, document findings and provide agreed submission support. Authority decisions remain with the responsible authority.

Locations

Where we take this appointment

For a site in Sharjah, Ajman, Ras Al Khaimah, Fujairah or Umm Al Quwain, tell us the location and we will confirm whether this service can be provided. All locations

Request a fire protection systems design review.

Discuss your project with ZFS. Send the location, building type, project stage and the support you need. Drawings or existing comments can be shared when available.

Request a fire protection systems design review.

No drawings are required to start.

Email or phone is required.

We reply within about 2 hours. We use your details only to respond. Privacy policy

Call Request a proposal