Performance Based Design

Performance Based Fire Design

Some projects present fire-safety questions that need a structured engineering assessment of an alternative design approach. ZFS develops performance-based studies around defined objectives, scenarios, acceptance criteria and the information available for the project.

The purpose is to establish a documented technical case, identify limitations and explain what the analysis means for the proposed design. An alternative approach must follow the appropriate review and acceptance process; analysis alone is not an approval.

Performance Based Fire Design
Performance-Based Design

Trusted by facility and project teams across the UAE

  • Serco
  • Abu Dhabi Grammar School
  • ENEC
  • Imdaad
  • Khidmah
  • Bab Al Qasr Hotel
  • Colliers

When to appoint

  • A complex or unusual design condition
  • Proposed alternative provisions
  • A project-specific question that requires quantified analysis

What you receive

  • An agreed design brief and assessment basis
  • Analysis outputs
  • A technical report explaining the case, limitations and recommendations
  • Authority-review support where included

Building height or scale alone does not automatically make performance-based design necessary.

What to send

  • Project strategy and plans
  • Proposed departure or alternative
  • Relevant system assumptions
  • Occupancy information
  • Prior comments or review requirements

How the appointment works

We confirm the scope and information required, complete the agreed review or site work, then issue the findings and deliverables. Any further design, retesting, reinspection or submission support is identified in the appointment.

Scope

  • Define the question and proposed approach
  • Establish relevant scenarios and assessment criteria
  • Identify modelling and analysis needs
  • Examine assumptions and sensitivity
  • Record results and implications
  • Support agreed technical review and comment responses

Fire and smoke modelling

Model selected fire and smoke conditions where the question needs that analysis. The report states the assumptions and the limits.

Structural fire resistance

Assess the fire resistance question that is actually in scope. A general description of the building is not that assessment.

Evacuation modelling

Model occupant movement for the defined population, routes and behaviour. The result is the scenario studied.

An alternative to a prescriptive provision

Set out the alternative, the criteria it is checked against, and what the analysis does not show.

Hazard assessment

Examine the defined hazard and the people who could be affected, and separate that from items that need a different appointment.

Support for an authority review

Help the team respond to comments where that support is included. The authority decision stays with the authority.

Questions

Does performance based design bypass the code?
No. It is a structured assessment of an alternative within the applicable framework and review route.
Will it reduce construction cost?
That depends on the project and the options assessed. A study should not be treated as a guaranteed cost reduction or approval outcome.
Is a model animation sufficient evidence?
No. The technical basis, assumptions, analysis, results and limitations need to be documented and reviewed.
Do I need drawings before I enquire?
No. Existing plans, reports or authority comments help define the scope, but you can start with a description of the project.
Can ZFS guarantee an authority approval?
No. We can review the relevant information, document findings and provide agreed submission support. Authority decisions remain with the responsible authority.

Locations

Where we take this appointment

For a site in Sharjah, Ajman, Ras Al Khaimah, Fujairah or Umm Al Quwain, tell us the location and we will confirm whether this service can be provided. All locations

Discuss a performance-based design study.

Discuss your project with ZFS. Send the location, building type, project stage and the support you need. Drawings or existing comments can be shared when available.

Discuss a performance-based design study.

No drawings are required to start.

Email or phone is required.

We reply within about 2 hours. We use your details only to respond. Privacy policy

Call Request a proposal