3D Emergency Evacuation Plan
3D Emergency Evacuation Plans
ZFS prepares evacuation plans that communicate the relevant escape information for a particular floor and display position. The plans are developed from the agreed drawings and site information, with the verification scope defined before issue.
The appointment can also address associated signage, emergency-planning coordination and updates following layout changes. Engineering egress assessments, emergency procedures and occupant training are identified separately so the deliverables are clear.
Trusted by facility and project teams across the UAE
When to appoint
- Building handover
- Fit-out or layout changes
- Missing or outdated displayed plans
- A review of facility emergency arrangements
What you receive
- Draft proofs for review
- Final agreed plan files
- A location and revision schedule where included
What to send
- Current floor plans
- Proposed display locations
- Existing strategy or escape information
- Site-access arrangements
- Branding and language requirements
How the appointment proceeds
- Review the layout and the information already available
- Map the primary and secondary exit routes for each floor in scope
- Set the assembly points the plans will show
- Review the plans again when the layout changes
Scope
- Floor-specific 3D plan preparation and agreed visual presentation
- Relevant escape-route, exit, assembly-point and equipment information, based on the verified project information
- Plan orientation and intended display positions
- Coordination of exit signage and wayfinding information within scope
- Links to occupant-load or egress analysis and ERP or training where separately needed
- Building, facility or event applications where the appointment and capability are confirmed
Questions
- Is a 3D plan an evacuation simulation?
- No. A displayed plan communicates information. A simulation evaluates defined scenarios and occupant-movement assumptions as a separate engineering exercise.
- How many plans do we need?
- The number and locations should be established for the building and the applicable requirements. Share the layouts and intended scope so this can be assessed.
- Can plans be updated after a fit-out?
- Yes. The revised layout and relevant escape information need to be checked before revised plans are issued.
- Are training and signage installation included?
- Only where identified in the proposal. They can be discussed as related appointments.
- Do I need drawings before I enquire?
- No. Existing plans, reports or authority comments help define the scope, but you can start with a description of the project.
- Can ZFS guarantee an authority approval?
- No. We can review the relevant information, document findings and provide agreed submission support. Authority decisions remain with the responsible authority.
Selected work
Projects
-
Abu Dhabi Ports Group HQ Building
3D emergency evacuation plans for Abu Dhabi Ports Group HQ Building, 22 plans.
-
Higher building Village Circle
3D emergency evacuation plans for Higher building Village Circle.
-
Greenfield International School Lobby Area
3D emergency evacuation plans for Greenfield International School lobby area, 42 plans.
Locations
Where we take this appointment
-
Fire safety consultancy in Dubai
Dubai Civil Defence reviews the submission. The proposal defines the ZähAVIS scope for the site.
-
Fire safety consultancy in Abu Dhabi
Abu Dhabi Civil Defence Authority enforces the UAE Fire and Life Safety Code in the emirate. The proposal defines the ZähAVIS scope for the site.
For a site in Sharjah, Ajman, Ras Al Khaimah, Fujairah or Umm Al Quwain, tell us the location and we will confirm whether this service can be provided. All locations
Request an evacuation-plan quotation.
Discuss your project with ZFS. Send the location, building type, project stage and the support you need. Drawings or existing comments can be shared when available.