Performance Based Design

Fire, Smoke & Evacuation Modelling

ZFS uses defined modelling studies to investigate fire-safety questions within the agreed project scope. The study identifies the modelled scenarios, inputs, assumptions and assessment criteria before results are interpreted for the design team.

Fire, Smoke & Evacuation Modelling
Fire & Evacuation Modelling

Trusted by facility and project teams across the UAE

  • Serco
  • Abu Dhabi Grammar School
  • ENEC
  • Imdaad
  • Khidmah
  • Bab Al Qasr Hotel
  • Colliers

When to appoint

  • A defined performance-based design question
  • Evaluation of proposed arrangements
  • Comparison of scenarios or design options requiring analysis

What you receive

  • An agreed study basis
  • A model and scenario description
  • Results and engineering interpretation
  • A sensitivity and limitations discussion
  • Recommendations for design consideration

Visualisations support the report rather than replace it.

What to send

  • Geometry and current plans
  • Occupancy information
  • Fire and smoke-system assumptions
  • The design question
  • Assessment and review requirements

How the appointment works

We confirm the scope and information required, complete the agreed review or site work, then issue the findings and deliverables. Any further design, retesting, reinspection or submission support is identified in the appointment.

Scope

Fire and smoke modelling

Assess selected aspects of modelled fire conditions and smoke or heat movement relevant to the question. State the model’s applicability and the assumptions behind the outputs.

Evacuation modelling

Assess occupant-movement scenarios using defined population, route and behavioural assumptions. How people are assumed to act is part of the scenario. Results are not a prediction of exactly how every person will behave.

Complex buildings

A high-rise or another complex arrangement can be studied when the question and the geometry are defined.

Confined spaces

A tunnel or an underground space can be studied where the model and the available information are suitable. The report states that limit.

Questions

Are the results exact predictions?
No. Results depend on the inputs, assumptions, tool applicability and scenarios considered. The report explains those limits and relevant sensitivity checks.
Is modelling the same as preparing a 3D evacuation plan?
No. Modelling is an analytical study. Displayed plans communicate escape information and are a separate service.
Do I need drawings before I enquire?
No. Existing plans, reports or authority comments help define the scope, but you can start with a description of the project.
Can ZFS guarantee an authority approval?
No. We can review the relevant information, document findings and provide agreed submission support. Authority decisions remain with the responsible authority.

Locations

Where we take this appointment

For a site in Sharjah, Ajman, Ras Al Khaimah, Fujairah or Umm Al Quwain, tell us the location and we will confirm whether this service can be provided. All locations

Discuss a modelling study.

Discuss your project with ZFS. Send the location, building type, project stage and the support you need. Drawings or existing comments can be shared when available.

Discuss a modelling study.

No drawings are required to start.

Email or phone is required.

We reply within about 2 hours. We use your details only to respond. Privacy policy

Call Request a proposal