Fire & Life Safety

Fire & Life Safety Strategy Reports

A fire strategy explains how the building’s fire-safety measures work together. ZFS prepares strategy reports that document the agreed design basis and help architects, engineers and project teams coordinate the provisions required for the building and its intended use.

The report identifies key assumptions and responsibilities so that later design, construction and operational decisions can be checked against a consistent basis.

Fire & Life Safety Strategy Reports
FLS Strategy Reports

Trusted by facility and project teams across the UAE

  • Serco
  • Abu Dhabi Grammar School
  • ENEC
  • Imdaad
  • Khidmah
  • Bab Al Qasr Hotel
  • Colliers

When to appoint

  • Before major layout decisions are fixed
  • During design development
  • Following a material change of use or design
  • When an existing strategy needs review

What you receive

  • A project-specific strategy report
  • Relevant supporting diagrams or calculations within scope
  • An assumptions and action register
  • A revision record

What to send

  • Current plans
  • Building use and occupant information
  • Design-stage programme
  • Existing strategy and authority correspondence

How the appointment works

We confirm the scope and information required, complete the agreed review or site work, then issue the findings and deliverables. Any further design, retesting, reinspection or submission support is identified in the appointment.

Scope

  • Occupancy and building-use assumptions
  • Escape and evacuation arrangements
  • Compartmentation and fire resistance
  • Fire-service provisions
  • Active protection and smoke management principles
  • Design interfaces and unresolved issues

Fire-safety objectives

State what the strategy is trying to achieve for this project, and which requirements it is written against.

Design criteria

Record the code basis and the criteria the later design is checked against.

Building and occupancy

Set the use and the occupancy the strategy is written for.

Fire-service access

Describe the access and the facilities the fire service needs.

Compartmentation

Set out how fire and smoke are limited by compartmentation and structural resistance.

Means of escape

Describe the escape routes and the assumptions behind them.

Fire protection systems

Identify the alarm, sprinkler and suppression principles the strategy relies on.

Smoke management

Identify the smoke-control principles and where they need later design.

Construction stage

Note the fire-safety measures that apply while the building is being built.

Fire-safety management

Record the management arrangements the strategy expects once the building is occupied.

Questions

Does the report replace detailed system design?
No. It sets the fire-safety approach and design requirements. Detailed engineering and coordinated installation drawings remain distinct deliverables.
Can the strategy change?
Yes. Significant changes to layout, use or systems may require review and revision. The report should remain aligned with the project information.
Do I need drawings before I enquire?
No. Existing plans, reports or authority comments help define the scope, but you can start with a description of the project.
Can ZFS guarantee an authority approval?
No. We can review the relevant information, document findings and provide agreed submission support. Authority decisions remain with the responsible authority.

Locations

Where we take this appointment

For a site in Sharjah, Ajman, Ras Al Khaimah, Fujairah or Umm Al Quwain, tell us the location and we will confirm whether this service can be provided. All locations

Discuss a fire strategy report.

Discuss your project with ZFS. Send the location, building type, project stage and the support you need. Drawings or existing comments can be shared when available.

Discuss a fire strategy report.

No drawings are required to start.

Email or phone is required.

We reply within about 2 hours. We use your details only to respond. Privacy policy