Fire protection systems need a clear design basis and coordinated interfaces with the building. ZFS provides design and review support for the agreed systems, helping teams address technical requirements, calculations, drawing coordination and submission comments.
Each appointment identifies whether ZFS is developing a design, reviewing another party’s work or supporting a later inspection/testing stage. Equipment supply, installation and maintenance are not implied by a design-review appointment.
Trusted by facility and project teams across the UAE
Fire Alarm & Detection Systems Design and Review
ZFS supports the design and review of fire alarm and detection arrangements for the defined project. We consider the building information, system requirements and coordination with other fire and life safety provisions, recording design issues and the information needed to resolve them.
When to appoint
New design
Fit-out or system alterations
Shop drawing review
Interface coordination before installation
Scope
Layout and zoning information
Device-selection and application proposals
System architecture and relevant supporting calculations
Cause-and-effect documentation
Interfaces with smoke control, suppression and other systems where included
What you receive
Agreed design or review documents
Marked-up drawings or a comments register
Identified coordination actions
Installation testing and witnessing are separately scoped.
Firefighting Systems Design and Review
ZFS provides design and review support for the firefighting systems included in the project appointment. The work considers the stated design basis, system layouts, supporting calculations and coordination with building and infrastructure constraints.
When to appoint
System design
Coordination of pump and storage provisions
Shop drawing submission
Modifications to existing installations
Scope
Applicable sprinkler, hydrant, standpipe and hose-reel arrangements
Pump and water-storage proposals
Hydraulic design information
Equipment data
System interfaces
Drawing and calculation consistency
What you receive
Agreed design or review outputs
Recorded comments
Recommended coordination actions
Testing, maintenance and equipment supply are separate responsibilities unless explicitly included.
Smoke Control & Pressurisation Design and Review
Smoke-control proposals need to be coordinated with the building’s fire strategy, geometry and operational sequences. ZFS supports design and review of the defined smoke-control and pressurisation arrangements, identifying assumptions, interfaces and issues requiring further analysis or verification.
When to appoint
Design development
Coordination with architecture and MEP
Review of revised layouts
Preparation for system testing
Scope
Design objectives and basis
Relevant fans, dampers and air paths
Control sequences
Alarm and power interfaces
Supporting design calculations
Identified testing and verification requirements
What you receive
A design or review report, or a comments register
Coordinated technical requirements
Recommendations for further analysis where needed
CFD analysis is an additional defined scope, not an automatic inclusion.
Special-Hazard Fire Protection Design and Review
Special-hazard protection must be considered against the particular equipment, occupancy and operating conditions involved. ZFS reviews or develops the agreed protection proposals, helping the project team document the design basis and coordinate relevant system interfaces.
When to appoint
A defined hazard needs specialist protection
A suppression proposal requires review
Equipment or enclosure conditions change
Scope
Relevant clean-agent, gaseous and kitchen-suppression proposals
Hazard and occupancy assumptions
Supporting manufacturer or design information
Activation and shutdown interfaces
Documented commissioning requirements within the appointment
What you receive
Agreed design or review documents
Technical comments
Information-gap records
Required follow-up actions
Emergency Lighting & Exit Signage Design and Review
ZFS supports the design and review of emergency lighting and exit signage for the defined project. The work considers escape routes, illumination and duration requirements, power arrangements and coordination with the fire alarm and the means of escape.
When to appoint
New design
Fit-out or layout changes
Shop drawing review
Coordination with escape routes and the fire alarm
Scope
Luminaire and exit-sign layouts
Illumination and duration requirements
Self-contained and central-power arrangements
Interfaces with the fire alarm where included
Consistency with the escape routes and the approved design
What you receive
Agreed design or review documents
Marked-up drawings or a comments register
Identified coordination actions
Installation testing and witnessing are separately scoped.
Fire protection systems design review
Check system drawings and supporting information, record comments and review responses.
Design review and site verification are separate stages. If installation inspections, functional testing or test witnessing are required, include those services in the appointment rather than assuming they are part of drawing review.
Abu Dhabi Civil Defence Authority enforces the UAE Fire and Life Safety Code in the emirate. The proposal defines the ZähAVIS scope for the site.
For a site in Sharjah, Ajman, Ras Al Khaimah, Fujairah or Umm Al Quwain, tell us the location and we will confirm whether this service can be provided. All locations
Discuss your systems design or drawing review.
Discuss your project with ZFS. Send the location, building type, project stage and the support you need. Drawings or existing comments can be shared when available.